7.8.10

Materials arriving for next teams

Inside of the class room that the Epping team will repair and re roof.

The mechanics workshop that will be rebuilt by the Toowoomba group.

The boys wash rooms that will have a roof fitted by the Epping team.


Bringing the materials up from the boat.


Unloading the timber.







No comments: